Achieve precise ESP deployment with IntactESP™ and Zone®
Don’t get stuck in a tight spot.
By combining virtual analysis with solutions-based engineering, Valiant provides a winning combination of technology to help operators overcome challenging well conditions, protect their investment, and allow deeper ESP deployment in the well while securing profitable recovery.

IntactESP™
Upgraded Flange Design for Maximum Pull Strength
Reinforced with alloy steel metallurgy and upgraded flange geometry for reliable performance at critical junctures

Zone® Stress Analysis
Full-String Virtual Test
Fine-tune equipment selection and placement in the wellbore to extend ESP run life while getting closer to the producing zone
Optimize ESP Installation with 3D Analysis
Valiant’s proprietary software calculates curvature data for every foot in the wellbore, allowing operators to visualize and model ESP deployment before the equipment ever reaches the site.
Let us Handle the Stress
Click here to learn more about our solutions for deviated or narrow wellbores.
- Reduce failure at flange connections
- Achieve deeper access to producing zone
- Mitigate financial and safety risks
- Avoid production setbacks
