Category: Case History
One afternoon in August, an operator called Valiant needing to replace a horizontal pump at a saltwater disposal site. Valiant responded just like any other day: a Valiant technician arrived on site, inspected the equipment, and diagnosed the failure as a broken shaft. Replacing the pump would be a quick fix, but there was another…
Valiant helps horizontal pump operators reduce unplanned downtime by stopping vibration problems at the source. Coyanosa, Texas – Challenged with severe vibration causing frequent shutdowns and reduced productivity, a horizontal pump operator called on Valiant to restore flow and pressure at a Permian saltwater disposal site. While not always obvious, vibration problems in horizontal pumping…
At one point or another, all surface equipment needs maintenance or replacements, especially in harsh oilfield conditions. To get the system running smoothly again as quickly as possible, operators need a service company that can provide responsive surface pump replacements with minimal downtime. When one West Texas operator was ready to downsize their horizontal pumping…
When one operator needed a quick turnaround on two horizontal pumping units for a saltwater disposal application in the Permian Basin, Valiant was able to turn on a dime, providing two VG9000 Aquarius horizontal pumps within 4 weeks from receiving the order. Handling produced water in the oilfield is a job that requires efficiency and…
With eyes-on monitoring and proactive ESP optimization, Valiant was able to flag a potential ESP failure before it occurred, improving production by over 80 barrels of oil per day. Too often, the signs that a failure is about to occur are only recognized after the damage is done. Luckily for one Permian producer, Valiant’s monitoring…
Enverus reports U.S. shale oil production at approximately 7.5 million barrels per day. To reach the oil in these tight formations, operators pump huge volumes of water into the rock through fracking, so that hydrocarbons can flow more freely to the surface. With some basins producing between 7 and 10 times as much water to…
Just as one Oklahoma operator was at their wit’s end due to repeated equipment failures, Valiant helped them achieve reliable ESP run life on a well previously believed to be too problematic to produce. LOCATION: Wilcox Formation, Pawnee, Oklahoma APPLICATION: High Sand Production, Abrasive Well Conditions Causing Broken Shaft Failures In the span of one…
When your operations are on standby due to power restrictions, you want a company that can deliver quality HPS startup service at the drop of a hat. For many operators in the Permian, power supply restrictions are straining production schedules. Due to the increasing demand for output needed to support oilfield activity, utility companies are…
Equipment isn’t cheap. So, when one operator needed an HPS system for a saltwater disposal well in a new reservoir, they weren’t going to do it on a guess. To save the customer time and get the right-sized equipment installed as soon as possible, Valiant implemented a quick solution to test out the well. Water…
For many oil producers in South America, water injection plays a crucial role in maximizing oil recovery. This was especially true for one operator in Peru who faced the challenge of establishing a complete water processing facility and injection system to keep their production profitable. By leveraging engineering expertise and extensive field experience, Valiant was…